CCMWG - 09/24/18

CCMWG - 09/24/18

Attending

Time:12:00PM PDT/03:00PM EDT - 01:00PM PDT/04:00PM EDT

Zoom: https://princeton.zoom.us/j/397525264



Participants

  • @Trey Pendragon  (Princeton University Library)

  • @tamsin woo (Data Curation Experts)

  • @James Griffin (Princeton University Library)



Agenda

  • Retrospective for Sprint 2

  • Steps before Samvera Connect



Notes

Retrospective on last week's sprint

First part: How were the check-ins?  How was the planning?

Griffin:

  • Check-ins were tight and direct.

  • Planning were built off of how the first sprint was undertaken. It was wise to focus on a smaller set of issues than many assumed was possible.

  • Couldn’t help but notice the capacity for the sprint seemed to vary. Is there some way we can improve outreach for the community to try and bring in more volunteers?

  • Would hate to see the group rechartered and the same members come on board and find themselves in position where their time is in short supply.

  • Was helpful to take on more technical issues.

  • Feel the group has been helpful and fills a niche within the community that needs to remain in place. Helpful to developers who are dedicated towards solution bundles such as Hyrax, given that it gives a larger sense of responsibility and facilitates task delegation. Anyone interested in participating in the review process it’s useful to have a body of people to contact if gem releases need shepherded etc.

Johnson:

  • Capacity, reflected in structure of group

  • Do not know how to increase capacity

  • Participation in stand-ups varied throughout the week

  • Scope was looked at in various ways

  • Lot of variability in how the group was looking at the tickets in the sprint

Pendragon:

  • Sprint went okay

  • Similar concerns about availability

  • Group's composition prevent that from being helped

  • Technical work was accomplished, particularly releases for Gems

  • The only other concern, was that it seemed like planning could have gone better

  • A number of issues were either unclear, or there was a secondary level of planning after running out of them mid-week

  • Discussion around the scope could have been improved



Second part: Thoughts on how the group as a whole is going?

If it's going well, re-charter during Samvera Connect

Griffin:

  • Supports rechartering the WG

  • Feels that drawing a greater degree of interest would be useful

  • Not certain how this would be undertaken, and voiced this in the retrospective for the last (i. e. first) sprint

Johnson:

  • This was very successful in getting us the kind of low-level view of dependencies

  • Having the calls alone provides us with the ability to conceptualize how to manage maintaining the core components

  • Doing more outreach and having some clarity about what folks doing maintenance on solution bundles or community calls should do when they find problems

  • Our approach is to have them route the requests through the product owners (who dispatch us as needed)

  • This might not be clear to members of the community, and this practice also has not been adopted

Pendragon:

  • It's good to have the discussions which we are having

  • These types of discussions used to happen as a part of the tech. call

  • Is this an evolution of the fact that there is a difference in the priority of the work now for the community?

  • Defining the scope when rechartering the WG would be the larger challenge

  • If we recharter the group, we have core components now...determining what type of tickets we take on will become a question

  • Need to propose and advertise processes

  • Also need to interface with Product Owners more consistently

  • If we need to release a Gem or update dependencies are understandable

  • But, should we be refactoring also? Are we now also the developers for these core component Gems?

Johnson:

  • Those do seem like the right questions

Pendragon:

  • If we recharter will we get the same members or new people?

  • There isn't a huge amount of interest in joining...what does that mean about our capabilities?

  • Next week, we should discuss this point more



Discussing steps before Samvera Connect

Pendragon:

  • We were going to sign up for a Lightning Talk

  • We should clarify what we were going to say there by next week

  • Should also provide an update regarding what is necessary in order to charter the next WG/Phase

  • Pendragon will produce the bullet points for the Lightning Talk for next week

  • See if there are any other items to discuss before looking to recharter



Meeting was adjourned at 12:19PDT/15:19 EDT



Postscript

During the call, @Mark Bussey (who was attending Samvera Camp as an instructor) provided the following feedback using Slack:

I'd be super supportive of seeing the group continue for another cycle - and I can try to make more time to wear my PO hat next round and/or try to engage other POs to help out if that would be useful.