Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Item

Notes

Project check-in:

Hyrax

  • Surfliner done with their sprints; Princeton sprinting now

  • Tidying up smaller features, then tidy up tests, aiming for stable 5.0 by Samvera Connect

Hyku

Avalon

Valkyrie

Core Components

Metadata


Topics:

Bulkrax


Fedora 6 WG

Partner Call (dev fund/pledges)

Additional Items?

...