Skip to end of metadata
Go to start of metadata

You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 5 Next »

Friday, January 28, 12 PM Pacific/3 PM Eastern

GitHub project

Group Updates

  • Update to Bootstrap 4 in Hyrax
  • Hyrax-Valkyrization
  • Hyrax Onboarding (M1-specific)
  • Fixing feature tests for docker-compose
  • Sharing steps for infrastructure
  • VSCode and Hyrax
  • Data Seeds Improvement

Retro (Plus / Delta)

PlusDelta













Questions


Wrap-up Instructions

Required roles: Host, note-taker 

  • Host will use the list of topics in the wiki to call on each facilitator. Facilitators should summarize:
    • The focus of the group
    • What the group accomplished
    • Whether there are next steps or follow-up steps and how those have been captured
  • Host will lead a retrospective
    • proposed format: plus/delta
    • Give 3 minutes at the beginning to allow people to take notes on what they want to say
    • Host invites people to "raise hand" to contribute to the retro
    • Participants can speak to both categories at once to reduce the time spent calling on people.
    • Ensure the notes are open so people can add things later





  • No labels