Samvera Community Wiki
Agenda: Wrap-up for Developer Congress January 24 -28, 2022
Friday, January 28, 12 PM Pacific/3 PM Eastern
GitHub project
Group Updates
Update to Bootstrap 4 in Hyrax
Adam - decent progress - addressing non-JS issues (CSS and markup)
Margaret - more work to do, talking to tamsin - main Bootstrap issues have been addressed
branch should remain in place - still outstanding JS issues and testing needs to be fixed
there are issues for most of this but there are still some issues to be created
finishing up seems pretty manageable but hard to estimate things like file uploader without more investigation
Blacklight work almost entirely done in that branch
everything that depends on Blacklight and Bootstrap is out of alignment and needs to be adjusted
Hyrax-Valkyrization
Lynette - excellent progress this week; still things to do to consider MVP done; getting files to show in all of the places they are supposed to show; tamsin and Alexandra made lots of progress but not quite done
permissions work today and close but still testing weird; very complex Solr query is needed right now; hoping to wrap this up today
Chris working on deletes
collection-specific deleting
clean up when deleting collection/admin set/work, deletes access control list (current work)
these are huge chunks out of MVP
updated UBER issue with this work
Alexandra - nurax-pg, can upload object with file attachments, get characterization, see it on show page, fileset show page still missing info and might not work at all
on deploy (nurax-dev and dassie) still using Fedora and Wings - nurax-pg is only place to see these changes working with non-Fedora (postgresql)
Next community effort: March 7-18 - Princeton team joining in for some work
Hyrax Onboarding (M1-specific)
new firepower image
PR nokogiri - comment to maybe move away from alpine linux but PR would be fix for now
Jon C tested and might have fully worked for him but there were possible network issues with docker
Fixing feature tests for docker-compose - didn't end up happening this week
Sharing steps for infrastructure - Hyrax Infrastructure Maintenance Steps - January 28, 2022
README update CONTAINERS might not have come through - no PR? follow up with tamsin
VSCode and Hyrax
Data Seeds Improvement
Michael - having trouble getting hyrax running locally; have idea on what to do but not able to make progress to do this work
might join up with HMWG next week?
Retro (Plus / Delta)
Plus | Delta |
|---|---|
Great teamwork on Hyrax-Valk work | use breakout rooms for topic work instead of separate zooms (host likely has to pre-set) |
pre-work by Margaret on Bootstrap helped to make a lot of progress this week | make sure facilitator reviews retro from previous dev congress |
smooth timing for check-ins and meetings across time zones; could do work locally and contribute to dev congress |
|
group size seemed good, not too small (3-4 per topic seems good for momentum) |
|
|
|
|
|
Questions
Wrap-up Instructions
Required roles: Host, note-taker
Host will use the list of topics in the wiki to call on each facilitator. Facilitators should summarize:
The focus of the group
What the group accomplished
Whether there are next steps or follow-up steps and how those have been captured
Host will lead a retrospective
proposed format: plus/delta
Give 3 minutes at the beginning to allow people to take notes on what they want to say
Host invites people to "raise hand" to contribute to the retro
Participants can speak to both categories at once to reduce the time spent calling on people.
Ensure the notes are open so people can add things later