Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.


...


Current Roadmap
(6 mos - 1 yr)

Proposed/Beyond One YearCompleted


HTML Comment
hiddentrue

Colors to use with panels to show status...

Panel titleBorder colorBackground colorTitle background colorTitle text color
In progressProgress
#339860
#c8f3c8
whitegreen
Partial work completed#caceac#e0e5bdwhite#868c5b
Not Started#aaafaf#d7ddddwhiteblack


The Hyku

...

Project

“Hyku” is the result of the Hydra-in-a-Box, IMLS grant-funded project. It was developed as a turnkey solution bundle for digital asset management by the Samvera (previously known as Hydra) community. Hosted solutions are in development with a goal to lower the barrier of entry and expand the number and diversity of institutions capable of leveraging this powerful digital repository platform.

...

Targeted within the Next Year (from today)

...

hyraxprojects]
Panel
borderColor#339860
bgColor#c8f3c8
titleColorgreen
borderWidth1
titleBGColorwhite
borderStylesolid
titleIn progress - [project board|Progress

Bulk Export

https://github.com/samvera-labs/hyku/

issues/

Bugfixes & Ongoing Maintenance Work

The Hyrax Working Group is charged with supporting core maintenance and development for Hyrax in order to provide a stable base of support for the solution bundle.  This working group is not meant to be a replacement for community-led development efforts and/or contributions, but rather, it is meant to augment such efforts.  This group may work on some Roadmap Items.  When they do, the group will be identified in the Status Summary section of the item1475

Required to allow full system backup and restore. Required to allow movement of tenants between stacks or between hosting providers. Required to allow for hand-off of content on tenant exit. Required for service exit strategy.

Status Summary/Major Activities:

    2018-08-13 Focus sprint focused on Accessibility roadmap item
  • Nearing completion via Oregon Digital Project, 2020
Target Date:
onging
Fall 2020

Lead:

  (DCE)
Working Group: Hyrax Working GroupIssues

 Rob Kaufman

Project: Oregon Digital



Group and responsibility management

Re-architect groups and responsibilities to improve clarity of functionWorking Group: Samvera Permissioning Analysis and Design Working Group
  • Nearing completion via Advancing Hyku, 2020
Panel
borderColor#caceac#339860
bgColor#e0e5bd#c8f3c8
titleColor#868c5bgreen
borderWidth1
titleBGColorwhite
borderStylesolid
titlePartial work completed
In Progress

DOI Integration

https://github.com/samvera-labs/hyrax-doi

Adds support for minting and storing a DOI for a work.  When supplying an existing DOI, user can autofill the deposit form by looking up metadata associated with a DOI.

Status Summary/Major Activities:

Target Date: TBD

Lead: LaRita Robinson  (Notre Dame)

Target Date: Fall 2020

Lead: Chris Colvard

Project: Advancing Hyku



Enhanced batch edit interface

Build out batch edit functionality to meet the needs, specifically, of digital collections-based repository implementations.

Status Summary/Major Activities:

  • NA
Panel
borderColor#aaafaf#339860
bgColor#c8f3c8#d7dddd
titleColorgreen
borderWidth1
titleBGColorwhite
borderStylesolid
titleNot started
Target Date: TBDLead: TBDWorking Group: TBD

Code Requirements

...

Requirement

...

Met?

...

How?

...

Code must be released at version >= 1.0

...

YES

Version 1.0.1

In Progress

Migration Tool

https://github.com/samvera-labs/hyku/

...

Good unit test coverage measured by community (e.g. 100% or 75% of what’s important)

...

YES

...

93%

...

YES

...

Travis

https://travis-ci.org/samvera-labs/hyku

...

uses Coverage tool (coveralls or simplecov)

...

YES

...

Coveralls

https://coveralls.io/github/samvera-labs/hyku?branch=master

...

Show compatibility with current Rails versions and other dependencies, when was it last tested; note compatibility with prior versions when available. Compatibility can be specified in the gemspec(s) or verified via CI matrix.

...

YES

...

Travis tests against ruby 2.4.1

v.1.0.1: Rails 5.1.6; Hyrax 2.3.3

...

Hierarchy of promises asserted in clearly defined acceptance tests

...

YES

Documentation Requirements

...

Requirement

...

Met?

...

How?

...

LICENSE file, Apache 2 (or compatible)

...

YES

...

LICENSE

...

README.md

...

YES

...

README.md

...

Statement of purpose

...

YES

...

Basic install steps

...

YES

...

Running the stack

...

Identify any volatile/experimental features

...

N/A

...

How to contribute

...

YES

...

CONTRIBUTING.md

...

How/Who to contact for help

...

YES

...

SUPPORT.md

Product Owner

...

Known issues documented in github Issues tickets (not just listed in text)

...

issues/1491

Most of the current pilot institutions have stated that they would not subscribe to a Hyku service until there is a clear migration path from CONTENTdm.

Status Summary/Major Activities:

Target Date:

Lead: 

Project: 



Panel
borderColor#339860
bgColor#c8f3c8
titleColorgreen
borderWidth1
titleBGColorwhite
borderStylesolid
titleIn Progress

Custom License and Rights Statements

Rightsstatement.org statements can be selected from a controlled list. However, no custom statement is possible. We need two rights statement fields, one controlled and one customizable[RK12] .

Status Summary/Major Activities:

Target Date:

Lead: 

Project: 



Panel
borderColor#aaafaf
bgColor#d7dddd
borderWidth1
titleBGColorwhite
borderStylesolid
titleNot Started

More Work Types

https://github.com/samvera-labs/hyku/issues

...

Tutorial / Walkthrough / Example usage

...

YES

...

Wiki

...

Resolve TODO items in documents and remove them

...

NO

...

There are 10 TODO items in the code.

...

All Contributors should have signed Hydra Contibutor License Agreement (CLA)

...

YES

...

Compare  https://github.com/samvera-labs/hyku/graphs/contributors

With https://wiki.duraspace.org/pages/viewpage.action?pageId=87460368

...

Requirement

...

Met?

...

How?

...

Community use by three or more institutions

...

YES

...

PALNI/PALCI with Notch8, King’s Fund with CoSector, British Library with Ubiquity, Texas Digital Library - Bridge2Hyku Project

...

In active use for six months

...

YES

...

Notch8, Ubiquity, CoSector and TDL have been working with the software for over 6 months. Prior to that DuraSpace, Stanford and DPLA were working on the software. Throughout that time the software has been in active development.

...

Has an ongoing maintenance plan.

...

YES

...

/1485

ETDs, Publications (articles, journals, books), and Datasets - Required to be competitive with alternative IR/Publishing solutions. Samvera community members are  working on Fulcrum, which is a publishing platform recently migrated to Hyrax.

Newspaper, Journal, Serial - Requested specifically by pilot institutions.

Status Summary/Major Activities:

Target Date:

Lead: 

Project: 



...