Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

  • Working with collection sprints
  • Document (rather than refactor) for feature specs
    • Pull them out into a separate route
    • Linked to Documentation WG
    • Created an issue in response to these needs
    • Easier to publish a page outlining the feature spec. refactoring proposal
    • Collaborated with Giarlo and Rayle

Rayle

  • Basic proposal is that the feature tests woiuld be extracted out of main test suiteOwn 
  • Own run in CI, run weekly or monthly
    • Wouldn't block builds for each Pull Request
  • The proposal details this approach

Hyrax 2.1 Release